10
2026-11
Project Background This 8,200 ㎡ cold chain fulfillment hub near the Port of Antwerp handles temperature-sensitive cross-border e-commerce goods, operating 24/7 across frozen, chilled and ambient temperature zones. The facility combines autom...
09
2026-11
Rapid growth in cross‑border e‑commerce has driven large‑scale expansion of overseas warehouses, sorting hubs and fulfilment centres worldwide. Automated sorting lines, conveyor systems and high‑capacity ventilation equipment generate continuo...
06
2026-11
The rapid growth of cross-border e-commerce has driven large-scale expansion of overseas warehouses, sorting hubs and fulfillment centers worldwide. Automated sorting lines, conveyor systems and high-volume ventilation equipment generate conti...
02
2026-11
Driven by the explosive growth of cross-border e-commerce, construction of overseas warehouses, fulfillment centers and sorting hubs has accelerated significantly in major markets around the world. Industry statistics show that the total area ...
23
2026-10
Regions including the EU and North America have successively updated occupational health and safety standards, tightening long-term worker noise exposure limits and strengthening on-site compliance inspections. This drives steady growth in the...
16
2026-10
Regions such as the European Union and North America have successively updated occupational health and safety standards, further reducing the limit of workers' long-term noise exposure, and strengthening on-site noise detection and compliance ...
09
2026-10
Driven by the continuous improvement of global food safety production specifications and occupational health standards, food processing factories are systematically upgrading their production environment management. Noise control, as an import...
08
2026-10
Project Overview This project delivers acoustic treatment for a 7,200 ㎡ food cold chain distribution center in Rotterdam, Netherlands, covering chilled sorting areas, packing zones, refrigeration equipment rooms and logistics corridors. Cons...
07
2026-10
Project Overview This project delivers acoustic treatment for the production workshop and sorting logistics area of a 6,500 ㎡ large automotive component manufacturing facility in a German industrial park. Dense automated production lines, co...